DOC-PRD-05 · Rev D
People board and capacity
A column for each person in schedule order, and a schedule that knows how many hours your people have.
01The board
Production → People board has one column for each person, with their tasks in the order the schedule wants them done. Drag a card to another person, or pull one in from Unassigned; the arrows move a card up or down. A Custom order chip shows when you have changed the order, until Reset to schedule.
02People as capacity
A labour cell is scheduled on the people who work in it, for example “2 people · 14 h/day”, and leave moves the dates. When a person is what is holding a job up, the Schedule says so: their name and the day they are free. The boards only ever say “Away”; the reason for someone’s leave is not shown.
03On the floor, and afterwards
The Floor board has a tile for each person with their next task. Work Orders → Reports → Time by person exports the hours booked by each person as a CSV.
See also
Who is doing what: people assigned to tasks, a list of each person’s own jobs on the phone, and a shared tablet that asks who you are.
The production board — jobs laid out over machines and time, with parallel lanes for machines running side by side.
Production jobs: draft → released → in progress → completed. Releasing issues materials from stock; completing books the finished parts back in.
Not covered here? Ask us — we answer, and the answer usually becomes a page.