Kojomfg

MRP · The floor

What to make next, on which machine, without the whiteboard.

Work orders built from bills of materials, a machine schedule with real capacity and a production calendar, a floor board the operators actually look at, and job packs you scan to start and finish. When the last work order completes, the order is nudged to QC.

Book a demo$39/mo · Per workshop, ex GST. Turn on or off monthly.

MRPMaterial Requirements Planning

$39 a month

In plain words: What to make, in what order, on which machine, and whether the material is there to make it. It is the whiteboard and the job cards, kept up to date for you.

  • See what a late job pushes before the customer finds out.
  • Operators scan the job pack to start and finish; the board updates itself.
  • Materials are checked against stock before a job is committed.

What it looks like

MRP, on screen.

Inside

Every screen, and who uses it.

Names are the ones you will see in the demo.

  • Engineering

    Bills of materials

    Components and operations per item, so a work order knows what it consumes and where it runs.

  • Production

    Work Orders

    Raised from an order or on their own. Quantities, materials, status, partial completions with good and scrap, and a stock check before you commit.

  • Production manager

    Schedule

    A machine schedule board with capacity per machine and a calendar of non-working days. Drag jobs; see what a late delivery pushes.

  • Floor

    Floor board

    The live shop-floor view: what is running, what is next, what is late.

  • Production manager

    Machines

    Machines and work centres with capability, hours and downtime — the constraints the schedule respects.

  • Operators

    Scan to start

    Job packs carry QR codes. Operators start and complete work from a phone, and the time on the job is captured.

  • Office

    QC hand-off

    When the linked work orders complete, the order shows a one-click move to QC, with inspection records where they are required. The QC requirements are your own list: the four standard certificates and reports, plus checks you add, like a weld visual or a coating thickness.

Do the sums

What it is worth.

Example — check the mathsMRP

Late jobs and the whiteboard

Without a schedule, the job that slips is the one nobody looked at.

Assumptions
  • 3 machines, 15 jobs a week
  • Without a schedule, 1 job a week slips a day
  • A slipped day costs a courier or a discount: $120
TodayWith NE Vault
Cost of slips per month
4 × $120 = $480
MRP: $39
Per week
$120
≈ $9

If the schedule prevents one slip a month, it has paid for itself three times over.

A day with it

  1. Monday, 7:00 am · toolbox

    The floor board is on the wall screen. Two jobs running, one late from Friday. The production manager drags it to the second lathe and the promise date holds.

  2. 10:30 am · machine 3

    An operator scans the job pack to start. The BOM had already flagged the flange stock as short, so purchasing knew on Friday.

  3. 3:45 pm · office

    The last work order completes. The order page offers Move to QC, then Invoiced, then Shipped. The customer watches it happen in their portal.

See production on your own parts.

Open a free workspace in about a minute — no card, set up for your trade. Or book a 30-minute walkthrough on your own parts.