The production board — jobs laid out over machines and time, with parallel lanes for machines running side by side.
01Drag to re-sequence
Drag jobs between slots and machines; queues stay honest as you move things.
02Suggestions built in
Jobs arrive with machine and hours suggested from the part’s routing and program run times.
03Non-working days and downtime
Projected dates assume a Monday-to-Friday week less your non-working days — public holidays and shutdowns set under Machines — so a job projected across Christmas lands after the shutdown rather than in it. A machine in downtime (maintenance, a breakdown, a tooling change) is blocked for the range while the other machines in its work centre keep the work; the queue header says which machine is down and why. The board looks 120 days ahead.
04Linked: Machines
The lanes come from your plant list — machines and work centres defined under Machines.