The stock you thought you had
A job that waits on material you believed was on the shelf costs more than the material.
- Stoppages per week
- 1.5
- 0 — available stock is checked when the job is raised
- Cost per week
- 1.5 × 2 h × $65 = $195
- $0
- Cost per year
- ≈ $10,000
- ERP: $39 × 12 = $468
One avoided stoppage a month pays for the module several times over.