Late jobs and the whiteboard
Without a schedule, the job that slips is the one nobody looked at.
- Cost of slips per month
- 4 × $120 = $480
- MRP: $39
- Per week
- $120
- ≈ $9
If the schedule prevents one slip a month, it has paid for itself three times over.
Who it’s for · Construction & building products
Building-product makers work to plans and to site dates. NE Vault takes the plan on a request, schedules the run, tracks the delivery and raises the invoice from the order — so progress claims and site calls are answered from the record.
Day one
Your two catalogs are called Processes and Materials across the whole workspace — the menu, the item form, the request forms your customers see.
Nothing is locked in. Rename, add or switch any of it off from Settings.
Panels, culverts, pits and beams cast to drawings; mixes and reinforcing.
Request forms: Precast quote
Roofing profiles, flashings, gutters and purlins cut to length; coil by thickness and colour.
Request forms: Cut-to-length order
Prefab roof trusses, wall frames, floor cassettes and engineered beams from plans.
Request forms: Frame & truss quote
Light-gauge steel wall frames, trusses and floor joists rollformed from plans.
Request forms: Framing quote
Aluminium windows and doors, glazing and install; suites and glass by thermal, acoustic and BAL rating.
Request forms: Window & door quote
On screen
Without a schedule, the job that slips is the one nobody looked at.
If the schedule prevents one slip a month, it has paid for itself three times over.
Thirty minutes on a call, on your own parts if you send a list. We apply your trade's template while you watch.